Power Distribution

Rural Electrification

Rural Electrification

Availability of power is one of the most important factors for economic and social development for any region. Towards the same goal of nation, where authorities are taking pre requisites steps to improve the situation, A.K. Construction is offering the huge wide range of expertise of experience in Execution of distribution and related project as best solution provider in Rural Electrification.

With experience in EPC segment, A.K. Construction is already an established brand in urban India. Furthermore, A.K. Construction has also taken the gift of electrification to rural and remote areas, and is making a mark there due to its broad portfolio of work. Rural electrification is used for lighting and household purposes as well as for mechanization of many farming operations, such as threshing, milking, and hoisting grain for storage. In areas facing labour shortages, electrifying parts of the farming operations also allows for greater productivity at reduced cost

The Company has electrified villages and has provided electricity . The company is capable of undertaking overhead, distribution lines projects encompassing pole mounted distribution substations, detailed engineering of the distribution line network, supply of various types of poles, pole mounted distribution transformers and related accessories, installation testing and commissioning.
Electricity is a basic need of life, and A.K. Construction believes in fulfilling this need wherever it’s required. Rural electrification is just another step to realize this idea.

Substation

Substation

A.K. Construction offers complete turnkey solutions from concept to commissioning on turnkey basis for from 33kV up to 220kV level as per IEC or other International Standards. The company has executed many EPC substation projects encompassing design & engineering, procurement, supply, installation, testing & commissioning in multiple countries across the nation.

A.K. Construction comes with the required proficiency and involvement on its back to execute EPC substation projects. The Substation segment of A.K. Construction offers complete solutions from concept to commissioning on turnkey basis for HV Substations from 33 kV to 220 kV level as per IEC or other International Standards.

The company has executed several EPC substation projects encompassing design and engineering, procurement, supply, installation, testing & commissioning in multiple states.

Feeder Separation

Feeder Separation

Many states in India are agricultural states with 70% rural population, and inadequate power supply in rural areas is one of the major obstacles affecting the economic growth and development. At present, rural power feeders feed mixed agriculture and domestic/village loads approximately for 8-10 hours. Agricultural pumps are provided with a three-phase supply for 6-8 hours. During the rest of the period, single-phase supply on the HV line is made available, intended for use in households and small businesses. Farmers use phase splitters and run their water pumps for extended hours resulting in power interruptions, abnormal loading of feeders and failures of distribution transformers. The currently inefficient system results in households not getting power round the clock. This leads to unbalanced loading of transformers and defeats the purpose of load shedding. Moreover, the current system of common supply to households and water pumps makes it difficult to locate and reduce commercial losses. The Government of various states has undertaken a feeder separation program to resolve these issues.
As the Government policy of providing free or concessionary rates on using electricity for water pumping would continue, the DISCOMs require a long-term solution, which satisfies five objectives:

Improvement in quality and reliability of power supply
Prevention of theft/direct hooking from LT network catering to non-agricultural load
Reduction in technical and commercial losses
Reduction in equipment/plant failures
Flexible load management for DISCOMs
Keeping the parameters set out by the Government, Bajaj carried out certain activities while executing projects. The key aspect of the feeder separation program is that it separates the irrigation and residential/commercial loads in rural areas so as to adopt measures to check pilferage of electricity.

The main project activities include:

Erection of 11 kV additional bays along with VCB, control relay panel
Laying of 11 kV lines on PCC poles with (rabbit) AAA conductor
Installation of 11/0.433 kV distribution transformers
HVDS (Conversion of existing LT to HT line)
Replacement of bare conductors of LT lines by AB cables
Provision of meters for un-metered consumers
GIS-based consumer indexing and asset mapping